← Back to all articles Time Tracking

Rotating Shift Schedules

A four-team rota grid showing day shifts, night shifts and days off across a cycle

A rotating shift schedule covers a 24-hour operation with a fixed number of teams cycling through days on, days off and, usually, day and night shifts. Four patterns account for most 12-hour rotas in manufacturing, healthcare, emergency services and utilities: DuPont, Panama (also called 2-2-3), Pitman and 4-on-4-off.

The generator below builds any of them for four teams from a start date and counts the hours, the longest run of shifts and the overtime. The sections after it explain the trade-offs, which mostly come down to one question: do your people want a whole week off every month, or every other weekend?

Build the rota

Where the workweek starts changes which shifts fall in which week, and so the overtime

D is a day shift, N a night shift, a dash is off. Four teams are shown offset so that every day has one team on days and one on nights. Weekly hours are counted from the payroll workweek start you choose against the federal 40-hour threshold; a state daily rule would add more. Only complete workweeks in the period are counted.

The four patterns

PatternCycleSequenceAvg hours/weekLongest runDistinctive feature
Panama (2-2-3)14 days2 on, 2 off, 3 on, 2 off, 2 on, 3 off423Every other weekend off; same shift throughout
Pitman28 daysPanama sequence, swapping days and nights every two weeks423Every other weekend off with rotation
DuPont28 days4 nights, 3 off, 3 days, 1 off, 3 nights, 3 off, 4 days, 7 off424Seven consecutive days off once a cycle; one 72-hour week
4-on-4-off8 days4 on, 4 off424Simplest; days off drift through the week

All four average 42 hours a week with 12-hour shifts, because each covers 168 hours with four teams. What differs is how the hours cluster. Panama and Pitman never exceed three shifts in a row and never exceed 48 in a week. DuPont concentrates work into one 72-hour week and pays for it with a full week off. 4-on-4-off is the easiest to run and the hardest to plan a life around, because the days off move forward through the week and only line up with a weekend every few cycles.

The overtime built into every 12-hour rota

Under 29 U.S.C. 207, overtime is hours over 40 in a workweek, and every one of these patterns produces weeks of 48 and weeks of 36. The 48-hour weeks carry eight hours of federal overtime regardless of the 36-hour weeks either side; averaging across the cycle is not permitted for private employers. The generator's overtime line counts this for Team A.

Three consequences. Budget the rota at roughly 42 straight-time hours plus the premium on the 48-hour weeks, not at 40. Choose the workweek start day deliberately: where the seven-day workweek begins changes which shifts fall in which week and can move overtime from one week to another without changing the pattern. And in states with daily overtime, every 12-hour shift carries four hours at a premium on top, which is why California employers on 12-hour rotas generally adopt an alternative workweek schedule by employee vote under Labor Code 511 to avoid it. Our time and a half calculator models the federal and California rules, and the shift differential entry covers the night premium most of these rotas also pay.

Choosing between them

Whichever pattern, the decision that matters more is fixed versus rotating nights. Fixed nights are better for sleep and worse for fairness; rotating is the reverse. Ask the teams before deciding, because a rota imposed on a workforce that wanted the other one is the most common reason a 12-hour schedule fails within a year.

Rules that constrain the rota

Key takeaways

Frequently asked questions

What is a 2-2-3 schedule?

A 14-day pattern of two shifts on, two off, three on, two off, two on, three off, run by four teams on 12-hour shifts. It is also called the Panama schedule. Each team works seven shifts a fortnight, averaging 42 hours a week, and gets every other weekend off.

What is the DuPont schedule?

A 28-day rotation for four teams: four nights, three off, three days, one off, three nights, three off, four days, then seven days off. It averages 42 hours a week and gives a full week off every cycle, at the cost of one week containing six 12-hour shifts.

What is the difference between Pitman and Panama?

They share the 2-2-3 sequence. Panama keeps each team on the same shift, days or nights. Pitman swaps a team between days and nights every two weeks, so the full cycle is 28 days and night work is shared equally.

How many hours a week is a 4-on-4-off schedule?

Forty-two on average with 12-hour shifts: four shifts in every eight days is 48 hours per eight days. Individual Monday-to-Sunday weeks alternate between 48 and 36 hours, and the 48-hour weeks carry eight hours of federal overtime.

Do 12-hour shifts mean overtime every week?

Not every week, but every rota has weeks over 40 hours and those hours are overtime under federal law. Averaging across a two- or four-week cycle is not permitted for private employers. States with daily overtime add a premium to every 12-hour shift unless an alternative workweek arrangement is in place.

How many teams does a 24/7 rotating schedule need?

Four, for 12-hour shifts. Two teams cover each 24-hour day and two are off, which is what produces the 42-hour average. Eight-hour rotas need at least four teams as well, and usually five to keep hours near 40.

← Back to all articles