6 Free Project Scope Templates

A project scope statement with in-scope, out-of-scope, deliverables and acceptance criteria sections

Scope is the boundary of a project: what it will produce and, as importantly, what it will not. Scope creep, the slow expansion of that boundary without new time or money, is the most reported cause of project overruns in every survey of project managers, and it happens one reasonable request at a time. The defense is a written scope that names the exclusions, a change process that prices additions, and acceptance criteria that say when a deliverable is done.

The six templates here cover that sequence: a scope statement, an in-scope and out-of-scope matrix, a work breakdown structure, a scope change request, a change log, and an acceptance criteria sheet. Excel holds the structured ones; Word and PDF hold the statement and the request form for signatures.

Download the templates

Free files: Word, Excel and PDF

Three files, free, no email required. Word to edit, Excel to track, PDF to print or share.

Templates open in Microsoft Word, Excel, Google Docs and Sheets, LibreOffice and any PDF reader. Free to use and adapt for your organization.

The six templates

Where scope creep comes from

Scope creep rarely arrives as a demand. It arrives as "while you are in there", as a stakeholder who was not consulted and now has requirements, as a deliverable whose definition was vague enough to stretch, and as a team that says yes to be helpful. Each is addressed by a document: the exclusions in the statement answer "while you are in there"; the stakeholder list in the project description catches the late requirer; the acceptance criteria fix the definition; the change request gives the team a way to say "yes, and here is what it costs".

The in-scope and out-of-scope matrix is the most useful page in the set because it forces exclusions to be written down by area. "Training is out of scope" written in April saves a week in September.

Running scope change control

A change request is not a refusal. It is a price. The form records the change, the reason, the impact on deliverables, schedule, cost, risk and quality, the alternatives, and a recommendation, and the sponsor decides. Most requests are approved; the point is that they are approved with their cost, so the baseline moves with them and the project is not later judged against a scope it was never funded for. The log keeps the cumulative impact visible, which is the number that stops the thirtieth small change.

Agile projects handle this differently, by fixing time and cost and flexing scope through the backlog; the agile templates cover that model. The change request still applies when the fixed things are asked to move.

Work breakdown and acceptance

The WBS turns deliverables into work packages small enough to estimate and assign, usually eight to eighty hours each. Each package carries an acceptance criterion so that done is defined before the work starts. The deliverables templates develop the acceptance side; the estimate templates price the packages.

Key takeaways

Frequently asked questions

What is a project scope statement?

A document that sets out a project's purpose, objectives, deliverables, what is in scope, what is out of scope, assumptions, constraints and how deliverables will be accepted, signed by the sponsor and the project manager. It is the baseline that change requests are measured against.

How do I prevent scope creep?

Write the exclusions down by area, name every stakeholder before planning, define acceptance criteria for each deliverable, and route every addition through a change request that states its cost and schedule impact. Approve changes with their cost rather than absorbing them.

What is a work breakdown structure?

A hierarchical breakdown of the project's deliverables into work packages small enough to estimate, assign and accept, usually eight to eighty hours each. It is the basis for the schedule, the estimate and the resource plan.

What should a scope change request include?

The change, who requested it and why, the impact on deliverables, schedule, cost, risk and quality, alternatives considered, a recommendation, and the sponsor's decision. The log records every request and the cumulative impact.

How is scope handled in agile projects?

Time and cost are fixed per sprint or release and scope flexes through a prioritized backlog, so a new requirement displaces a lower one rather than extending the project. A change request is still used when the fixed time or cost is asked to change.